Road Warrior

Travis Baker blogs about the problems and idiosyncrasies of Kitsap highways and byways.
Subscribe to RSS

Half of Ogle Road repaved, what about other half?

July 15th, 2009 by travis baker

 

The in basket: Cheryl Berger was perplexed in mid-June by what looked like a shabby paving job on the northernmost stretch of Ogle Road in Brownsville and e-mailed me for an explanation.

It turned out the work was what is called pre-leveling for a full repaving, and that was done the day after she wrote to me. 

But that left her with another question. “Do you think they’re going to do the southern half (south of Madison)?  I mean, its pretty ratty, too,” she said.

The out basket: Doug Bear of Kitsap County Public Works, replies, “The portion south of there is in better condition than what we paved and did not rank high enough among priorities to get overlaid this year.

“We look at all roads each season to determine how best to utilize the limited funding available for paving. The portion south will be considered for paving next summer,” he said.

Tags: , , , ,

Email This Post Email This Post

Leave a Reply

Before you post, please complete the prompt below.

Enter a word that starts with the letter C:

Available on Kindle

Road Warrior Tip

You can reach Travis Baker at tvisb@wavecable.com

Categories