Kitsap Transit came out Wednesday with how it plans to get along without the Manette Bridge, which will be closed all of next week between 9 a.m. and 3 p.m. They’ve got it figured out before the state has even announced — to us, anyway — that the bridge will be closed. I presume its for annual inspection.
Routes 21, 25 and 29 will be detoured, and KT will run a Manette shuttle to serve riders who’ll lose service on the aforementioned routes.
Here’s the details:
#21 Perry
Avenue –
The #21 bus will travel to and from the Bremerton Transportation
Center using the Warren Avenue Bridge. It will serve Sheridan
between Wheaton and Schley, Schley between Sheridan and Magnuson,
Magnuson to Perry Avenue and Perry from Stone Way to Sylvan. The
portion of the trip between Perry and Sylvan and the East Bremerton
Transfer Center will operate normally.
#25 East Park – The
#25 bus will travel to and from the Bremerton Transportation Center
using the Warren Avenue Bridge. It will serve the Harrison
Hospital loop then serve the north portion of Lebo, Rickey, Pine
and Sheridan as it normally does.
#29
Trenton Avenue – The #29 bus will travel to and
from the Bremerton Transportation Center using the Warren Avenue
Bridge. It will serve Sheridan between Wheaton and Perry, Perry
between Sheridan and Stone Way, and Stone Way between Perry and
Trenton. The portion of the trip north of Trenton and Stone Way and
the East Bremerton Transfer Center will operate
normally.
Manette Closure Shuttle – The Manette Closure
Shuttle bus will serve Shore Drive, 11th, the south end of Trenton
Avenue and Perry Avenue, Old Wheaton Way and Harrison Hospital,
taking riders to the East Bremerton Transfer Center. It will
meet the eastside buses at the transfer center, then operate as a
take-home back to the Manette area.
Manette Closure Shuttle
Schedule: www.kitsaptransit.com/MCShuttle.html
Manette Closure Shuttle Map: www.kitsaptransit.com/mapManette.html